CENTRIFUGAL PUMP DESIGN | MIXED FLOW |
CRITICALITY CODE JUSTIFICATION | ZZZY |
CURRENT RATING IN AMPS | 244.2 |
CURRENT TYPE | AC |
FREQUENCY IN HERTZ | 60.0 |
MAXIMUM DISCHARGE FLOW RATE | 7900.0 GALLONS PER MINUTE |
MEDIA FOR WHICH DESIGNED | WATER, SALT |
OPERATING SPEED AT RATED CAPACITY | 1200.0 REVOLUTIONS PER MINUTE |
PHASE | THREE |
PRIME MOVER POWER RATING | 200.000 HORSEPOWER |
PRIME MOVER QUANTITY | 1 |
PRIME MOVER TYPE | ELECTRIC MOTOR |
PUMP QUANTITY | 1 |
PUMPING ELEMENT OPERATING POSITION | VERTICAL |
REFERENCE NUMBER DIFFERENTIATING CHARACTERISTICS | TRIDENT PLANNED EQUIPMENT REPLACEMENT (TRIPER) AND ADVANCED EQUIPMENT REPAIR PROGRAM (AERP) PROCEDURES IAW NAVSUP WSS INST 4420.170 OPERATING PROCEDURE 3. INCLUDES BOTH L1/SS/Q3/Q5/SOC AND NON-L1/SS/Q3/Q5/SOC TRIPER/AERP COMPONENTS. TRIPER/AERP EQUIPMENT HAVE SPECIAL REQUIREMENTS BUT NO SPECIFIC MATERIAL CONTROL |
VOLTAGE IN VOLTS | 440.0 |