Search Criteria

NSN/NIIN No.:
Part No. :
(13-16 digit NSN/9 digit NIIN)
9905-00-477-41379905-00-477-4131
NSNDescriptionAssign Date
2840-00-477-4136SUPPORT ASSEMBLY06/12/1974
NSNDescriptionDetailOpen Solicitations
2840-00-477-4136SUPPORT ASSEMBLY0
Part NumberDescriptionCompanyQuantity
 METAL DYNAMICS INTERNATIONAL CORPORATION0
726967SUPPORT ASSEMBLY, NO.2 BEARING SEAL GMS INTERNATIONAL CORPORATION0
 TRANSAERO, INC.0
726967SHAFT SHORELINE AEROSPACE LLC2
726967SHAFT HAYWARD AND GREEN DEFENCE LTD5
For additional information Register for Free Trial
CompanyAward DateQuantityPriceContractDelivery Date
Free Trial03/01/2023Free TrialFree TrialSPE4A723P6996 04/04/2024
Free Trial06/15/2022Free TrialFree TrialSPE4A722PA576 08/21/2023
Free Trial12/17/2021Free TrialFree TrialSPE4A722P3045 11/22/2022
Free Trial04/15/2019Free TrialFree TrialSPE4A719P9045 05/04/2021
Free Trial03/31/2018Free TrialFree TrialSPE4A718P8601 04/30/2018
Free Trial03/27/2017Free TrialFree TrialSPE4A717P7539 01/06/2020
Free Trial08/18/2016Free TrialFree TrialSPE4A716MB912 09/12/2017
Free Trial04/01/2016Free TrialFree TrialSPE4A716M6974 06/01/2018
Free Trial03/03/2016Free TrialFree TrialSPE4A716M5883 05/30/2017
Free Trial05/19/2008Free TrialFree TrialSPM4A708MA804 12/12/2009
For additional information Register for Free Trial
Part NumberCompanyCAGE
726967HANWHA AEROSPACE USA LLC06959
726967PCX AEROSYSTEMS-MANCHESTER, LLC15152
726967DEMUSZ MFG. CO., INC.2V116
726967ELECTRO METHODS INC33617
726967UNION MACHINE CO OF LYNN, INC51992
726967RTX CORPORATION52661
726967AMBEL PRECISION MANUFACTURING CORPORATION54850
726967J.T. SLOCOMB CORP55282
726967RTX CORPORATION77445
726967MB AEROSPACE EAST GRANBY, LIMITED PARTNERSHIP00270
For additional information Register for Free Trial
NameValue
OVERALL LENGTH3.520 INCHES NOMINAL
OVERALL DIAMETER7.725 INCHES NOMINAL
END ITEM IDENTIFICATIONACFT ENG TF33
CRITICALITY CODE JUSTIFICATIONMATT AND ABHP AND ADAV AND AGAV
MATERIALSTEEL
For additional information Register for Free Trial
CodeDefinition
ACQUISITION METHOD CODE.
'All Departments1SUITABLE FOR COMPETITIVE ACQUISITION.
ACQUISITION METHOD SUFFIX CODE.
'All DepartmentsCTHIS PART REQUIRES ENGINEERING SOURCE APPROVAL BY THE DESIGN CONTROL ACTIVITY IN ORDER TO MAINTAIN THE QUALITY OF THE PART. AN ALTERNATE SOURCE MUST QUALIFY IN ACCORDANCE WITH THE DESIGN CONTROL ACTIVITY’S PROCEDURES, AS APPROVED BY THE COGNIZANT GOVERNMENT ENGINEERING ACTIVITY. VALID AMCS: 1, 2, 3, 4 AND 5.
MAJOR ORGANIZATIONAL ENTITY.
Air ForceDFAir Force
Defense Logistics Agency.DSDefense Logistics Agency.
PRICE
All DepartmentsPrice6373.08
PRECIOUS METALS INDICATOR CODES.
All DepartmentsAItem does not contain Precious Metal.
CRITICALITY CODE.
All DepartmentsFThe item is an Aviation Critical Safety Item/Flight Safety Critical Aircraft Part ((ACSI/FSCAP).
AUTOMATIC DATA PROCESSING EQUIPMENT.
All Departments
ELECTROSTATIC DISCHARGE CODE.
All Departments
HAZARDOUS MATERIALS INDICATOR CODE.
All DepartmentsNIndicates there is no data in the HMIRS and the NSN is in a FSC not generally suspected of containing hazardous materials.
DEMILITARIZATION CODE.
All DepartmentsQCommerce Control List Items (CCLI) – Mutilation to the point of scrap required outside the United States. In the United States, mutilation requirement determined by the DEMIL Integrity Code. DoD Trade Security Controls (TSC) required in the United States. (Note 8).
For additional information Register for Free Trial
SUPPORT ASSEMBLY, NO.2 BEARING SEAL NOTICE TO CONTRACTOR: THE PROCUREMENT ITEM DESCRIPTION EXCEEDS THE ANSI STANDARD FOR EDI TRANSACTIONS (840 REQUEST FOR QUOTE AND 850 PURCHASE ORDER); VENDORS THAT ARE RECEIVING THIS INFORMATION VIA AN EDI 840 OR 850 CAN OBTAIN THE COMPLETE ITEM DESCRIPTION BY ACCESSING THE SOLICITATION/AWARD FROM THE DLA INTERNET BID BOARD SYSTEM (DIBBS) AT: (https://www.dibbs.bsm.dla.mil) UNITED TECHNOLOGIES CORP. PRATT AND WHITNEY DIV CONFIGURATION CONTROL APPLIES FURNISHED ITEM MUST CONFORM TO THE CITED REQUIREMENTS/REVISION. VARIATIONS MUST BE IDENTIFIED AND APPROVAL OBTAINED IN ACCORDANCE WITH MIL-STD-973 DATED 17 APR 92 AND INTERIM NOTICE 3 DATED 13 JAN 95. PARAGRAPH 5.4.2 REQUIREMENTS FOR ENGINEERING CHANGE PROPOSALS AND APPENDIX D INSTRUCTIONS FOR THE PREPARATION OF AN ECP UTILIZING DD FORMS 1692 THRU 1692-7. PARAGARAPH 5.4.3 REQUIREMENTS FOR REQUESTS FOR DEVIATION (RFD), 5.4.4 REQUIREMENTS FOR REQUESTS FOR WAIVER (RFW) AND APPENDIX E INSTRUCTIONS FOR THE PREPARATION OF REQUESTS FOR DEVIATION/WAIVER UTILIZING DD FORM 1694. PARAGRAPH 5.4.6 REQUIREMENTS FOR SPECIFICATION CHANGE NOTICES (SCNS), 5.4.7 REQUIREMENTS FOR NOTICES OF REVISION (NORS), APPENDIX F INSTRUCTIONS FOR PREPARATION OF SPECIFICATION CHANGE NOTICE UTILIZING DD FORM 1696 AND APPENDIX G INSTRUCTIONS FOR PREPARATION OF NOTICE OF REVISION UTILIZING DD FROM 1695. PARAGRAPH 5.4.8 CONFIGURATION CONTROL (SHORT FORM PROCEDURE.) . ITEM SHALL BE MARKED IN ACCORDANCE WITH MIL-STD-130N DATED 17 DEC 2007. . OFFERORS REQUESTING SOURCE APPROVAL ON THE BASIS OF PREVIOUS MANUFACTURE OF PRODUCTION QUANTITIES OF SIMILAR AEROSPACE ITEM(S) FOR THE GOVERNMENT, OEM OR OTHER AEROSPACE USERS, MUST SUBMIT THE FOLLOWING ADDITIONAL DOCUMENTATION OR CERTIFICATIONS: 1. COMPLETE TECHNICAL DATA PACKAGE TO INCLUDE ALL ASSOCIATED DRAWINGS AND DRAWINGS OF SIMILAR PART(S) MANUFACTURED, INCLUDING RELEVANT PROCESS SPECIFICATIONS AND ACTUAL PROCESS SHEETS. 2. IDENTIFICATION OF MAJOR DIFFERENCES BETWEEN THE SIMILAR ITEM AND APPROVED PART. 3. EVIDENCE OF TESTING CONDUCTED ON THE MATERIALS USED IN THE PRODUCTION OF THE SIMILAR ITEM AND ASSURANCE MATERIALS ARE IN CONFORMANCE WITH REQUIRED SPECIFICATION. 4. DESCRIPTION OF VALUE ADDED BY OEM INCLUDING ANY FABRICATION, ON SITE INSPECTIONS, QUALITY ASSURANCE SURVEILLANCE ON SUBVENDERS, TOOLING, MANUFACTURING PROCESS SHEETS OR PROCESS DATA FOR USE IN THE FABRICATION OF THE SIMILAR ITEM. 5. EVIDENCE OR CERTIFICATION(S) THAT THE CONTRACTOR WAS RESPONSIBLE FOR ENTIRE MANUFAC- TURING PROCESS OF OF THE SIMILAR ITEM. EVIDENCE SHOULD INCLUDE ALL MATERIAL, IN-PROCESS INSPECTIONS AND CERTIFICATIONS. 6. EVIDENCE THAT THE ITEM WAS PRODUCED IN PRODUCTION QUANTITIES AND THE END ITEM(S) MET ALL REQUIREMENTS AND WERE ACCEPTABLE TO THE CUSTOMER, I.E., CONTRACT AND SHIPPING DOCUMENTS SHOWING PART NUMBER, STOCK NUMBER (IF APPLIC- ABLE), WITH QUANTITIES DELIVERED AND ACCEPTED. 7. COMPARISON OF MANUFACTURING AND INSPECTION PROCESSES SHOW THAT THE SIMILAR PART INCLUDES THE FULL SCOPE OF PROCESSES, INCLUDING INSPECTIONS REQUIRED TO MANUFACTURE THE SUBJECT ITEM AND THE PROCESSES ARE OF EQUAL OR GREATER COMPLEXITY. DSCR DOES NOT CURRENTLY HAVE AN APPROVED TECHNICAL DATA PACKAGE AVAILABLE FOR THIS NSN. DATA IS PROPRIETARY OR INSUFFICIENT FOR COMPETITIVE PROCUREMENT. QUALITY ASSURANCE INSTRUCTIONS FOLLOW......... ARTICLES TO BE FURNISHED HEREUNDER SHALL BE MANUFACTURED, TESTED AND INSPECTED IN ACCORDANCE WITH THE DRAWING REVISION CITED IN THE CONTRACT, ALL DETAILS AND SPECIFICATIONS REFERENCED THEREIN. I. QUALITY/INSPECTION REQUIREMENTS: A. FIRST ARTICLE TESTING APPLIES. B. MANDATORY INSPECTION PARAGRAPH III APPLIES. II. SUPPLEMENTAL REQUIREMENTS: A. THE FIRST ARTICLE OFFERED MUST BE MANUFACTURED AT THE FACILITIES IN WHICH THAT ITEM IS TO BE PROCURED UNDER THE CONTRACT, OR IF THE FIRST ARTICLE IS A COMPONENT NOT MANUFACTURED BY THE CONTRACTOR, SUCH COMPONENT MUST BE MANUFACTURED AT THE FACILITIES IN WHICH THE COMPONENT IS TO BE PRODUCED FOR THE CONTRACT. A CERTIFICATION TO THIS EFFECT MUST ACCOMPANY EACH FIRST ARTICLE WHICH IS OFFERED. B. THE CONTRACTOR SHALL IDENTIFY ON THE PROCESS/OPERATION SHEETS ALL MANUFACTURING SOURCES PERFORMING PROCESSES/OPERATIONS OUTSIDE OF THEIR FACILITIES. THESE SHEETS SHALL NOT BE REVISED OR ALTERED AFTER THE SUCCESSFUL COMPLETION OF FIRST ARTICLE OR PRODUCTION LOT TESTING WITHOUT APPROVAL FROM THE ENGINEERING SUPPORT ACTIVITY VIA THE PCO. C. THE INSPECTION METHOD SHEETS WHICH LIST THE CHARACTERISTICS OF EACH ITEM PRODUCED UNDER THE CONTRACT SHALL HAVE SERIAL NUMBER TRACEABILITY TO THE RAW MATERIAL, OR FORGING. IN ADDITION, THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING COMPLETED INSPECTION METHOD SHEETS SHOWING THE ACTUAL DIMENSIONS TAKEN. D. SEE MIL-HDBK-831 DATED 23 APR. 1999 IN PREPARATION OF THE FIRST ARTICLE TEST AND INCLUDE OBJECTIVE EVIDENCE OF COMPLETE DIMEN- SIONAL INSPECTION AND CHEMICAL/PHYSICAL PROPERTY TESTING INCLUDING COPIES OF ALL CERTIFICATIONS. FOR THE MATERIAL AND PROCESSING PERFORMED AS CITED ON THE DRAWING. THIS REPORT SHALL BE MAILED TO THE GOVERNMENT TESTING ACTIVITY TOGETHER WITH THE FIRST ARTICLE. E. THE FIRST ARTICLE WILL NOT SERVE AS A MANUFACTURING STANDARD. F. MARKINGS SHALL BE I/A/W MIL-STD-130, REVISION K, 15 JAN 2000, UNLESS OTHERWISE SPECIFIED IN THE ORIGINAL EQUIPMENT MANUFACTURER'S DRAWING. III. MANDATORY INSPECTION REQUIREMENTS: DURING FIRST ARTICLE PRODUCTION, MANDATORY INSPECTION IS REQUIRED TO BE ACCOMPLISHED BY THE CONTRACTOR AS FOLLOWS: A. LEVEL OF INSPECTION (LOI). 1. CRITICAL CHARACTERISTICS: 100 PER CENT INSPECTION SHALL APPLY. 2. MAJOR AND MINOR CHARACTERISTICS-LOI SHALL BE I/A/W A SAMPLING PLAN ACCEPTABLE TO THE QAR. B. MAJOR AND MINOR CHARACTERISTICS SHALL BE DEFINED BY THE CONTRACTOR SUBJECT TO QAR CONCURRENCE, UNLESS DEFINED ON APPLICABLE DRAWINGS AND ASSOCIATED SPECIFICATIONS. IV. UNLESS EXPRESSLY PROVIDED FOR ELSEWHERE IN THIS CLAUSE, EQUIPMENT SUCH AS: FIXTURES, JIGS, DIES, PATTERNS, TEMPLATES, MYLARS, SPECIAL TOOLING, TEST EQUIPMENT, OR ANY OTHER MANUFACTURING AID REQUIRED FOR THE MANUFACTURE AND/OR TESTING OF THE SUBJECT ITEM(S) WILL NOT BE PROVIDED BY THE GOVERNMENT OR ANY OTHER SOURCE AND IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. THE FOREGOING APPLIES NOTWITHSTAND- ING ANY REFERENCE TO SUCH EQUIPMENT OR THE FURNISHING THEREOF THAT MAY BE CONTAINED IN ANY DRAWING OR REFERENCED SPECIFICATION. A. FIRST ARTICLE INSPECTION/TEST CRITERIA: THE FOLLOWING TESTS SHALL BE PERFORMED UNDER THE FIRST ARTICLE APPROVAL CLAUSE OF THE CONTRACT: 1. FORM 2. FIT (INSTALLATION OF PARTS TO ENSURE PROPER MATING WITH THE RELATED COMPONENTS). 3. COMPLIANCE WITH THE DRAWING REVISION CITED IN THE CONTRACT DRAWING, ASSOCIATED DRAWINGS AND SPECIFICATIONS THEREIN, INCLUDING BUT NOT LIMITED TO, DIMENSIONS, MATERIAL, HEAT TREAT, FINISH, AND OTHER REQUIRED PROCESSES. B. QUANTITY OF SAMPLES TO BE SUBMITTED FOR TESTING IS THREE. CONDITIONS FOR WAIVER OF FIRST ARTICLES ARE: 1. OFFERORS WHO HAVE PREVIOUSLY FURNISHED PRODUCTION QUANTITIES OF THE SAME ARTICLE TO THE GOVERNMENT, DOD, AIR FORCE. 2. OFFERORS WHO HAVE PREVIOUSLY FURNISHED PRODUCTION QUANTITIES OF THE SAME ARTICLE TO THE PRIME CONTRACTOR FOR DELIVERY TO THE GOVERNMENT, DOD, AIR FORCE. 3. OFFERORS CURRENTLY IN PRODUCTION OF THE SAME ARTICLE FOR A GOVERNMENT, DOD, AIR FORCE CONTRACT AND WHO HAVE RECEIVED FIRST ARTICLE APPROVAL UNDER THE EXISTING CONTRACT. 4. OFFERORS WHO HAVE PREVIOUSLY FURNISHED PRODUCTION QUANTITIES OF THE SAME ARTICLE TO THE GOVERNMENT, DOD, AIR FORCE PROVIDING ARTICLES THUS FURNISHED HAVE EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE, IN THE OPINION OF THE GOVERNMENT. 5. PROVIDED NOT MORE THAN THIRTY-SIX (36) MONTHS HAVE ELAPSED SINCE COMPLETION OF THE CONTRACT. C. SHIP FIRST ARTICLE EXHIBITS (ONLY) TO: DDOO-SOP (FIRST ARTICLES) BLDG 18 DOOR 16 (405) 739-7667 8080 PERIMETER RD TINKER AFB, OK 73145-8000 DODAAC: FY2303 MARK FOR: FIRST ARTICLES ATTN: DDOO-SOP SHIP FIRST ARTICLE TEST REPORTS/PLANS/AND ANY SUPPORTING CONTRACTOR D
Cage# 15152 and PartNumber# 726967
Cage# 51992 and PartNumber# 726967
Cage# 52661 and PartNumber# 726967
Cage# 33617 and PartNumber# 726967
Cage# 54850 and PartNumber# 726967
Cage# 06959 and PartNumber# 726967
Cage# 55282 and PartNumber# 726967
Cage# 2V116 and PartNumber# 726967
Cage# 77445 and PartNumber# 726967
Doc. NumberDoc. TypeDoc. Def.Doc. CodeDoc. DateAmdt. DateCage
QAP-E09QAPBASICQA04/27/200409/24/2006 13873